What will be the solution for tubes (or iron rods). we buy 1000 iron rods, each Rod have a length of 6 meters.
while using it the factory we cut these rods, how can i track the remaining cuts.
shall i create batch for every remaining length (6m, 5m, 4m, 3m, 2m, 1m) ? if yes, how to manage and transfer quantities from batch to another. ie if a rod length 5m i cut from it 1 meter, the remaining is 4meters it should be moved to the batch of the 4m!!
or there is another solution?