Hi,
I would like to modify Planning optimization process. In order to do so I found below article to extend the method for it.
However, when I was going to through pre-requisite for it, I found that it can only be enabled for Tier 2+. If this is hard requirement then how can we perform modification in Tier 1 along with unit testing of it. The below article list Tier2+ requirement:
Thank you